Utility Assistance

We deal with the utility paperwork, you keep building

Interconnection applications, net metering enrollment, and permission to operate — filled out correctly, tracked, and followed up on until your meter is spinning backwards.

The red tape we take off your plate

Interconnection application forms that reject on small formatting errors

Utility-specific one-line diagrams and equipment lists

Net metering / net billing tariff selection you've never heard of

Insurance certificates and liability documentation requests

Supply-side vs. load-side tap questions from the utility engineer

Weeks of silence, then a correction notice with a 10-day deadline

Permission to Operate (PTO) delays after your system is finished

Meter swap scheduling and coordination

The utility approval timeline

Week 1 — Intake & utility research

We identify your utility, tariff options, and application route, then collect the documents they require.

Week 1–2 — Application submitted

We prepare and file the interconnection application with diagrams and spec sheets attached.

Week 2–6 — Utility review

We track the queue, answer engineering questions, and respond to any correction requests on your behalf.

Approval to install

You receive written conditional approval — this is the green light to start your install.

Inspection & final documents

After your electrical inspection passes, we submit the signed agreement and inspection card.

Permission to Operate

Meter exchange is scheduled, PTO is issued, and you legally switch the system on.

Flat rate

$495

Covers your full interconnection and net metering process from application through Permission to Operate.Book a Consultation

Application prepared and filed for you

Net metering tariff guidance

Utility correspondence handled

PTO follow-through, not just filing