The red tape we take off your plate
Interconnection application forms that reject on small formatting errors
Utility-specific one-line diagrams and equipment lists
Net metering / net billing tariff selection you've never heard of
Insurance certificates and liability documentation requests
Supply-side vs. load-side tap questions from the utility engineer
Weeks of silence, then a correction notice with a 10-day deadline
Permission to Operate (PTO) delays after your system is finished
Meter swap scheduling and coordination
The utility approval timeline
Week 1 — Intake & utility research
We identify your utility, tariff options, and application route, then collect the documents they require.
Week 1–2 — Application submitted
We prepare and file the interconnection application with diagrams and spec sheets attached.
Week 2–6 — Utility review
We track the queue, answer engineering questions, and respond to any correction requests on your behalf.
Approval to install
You receive written conditional approval — this is the green light to start your install.
Inspection & final documents
After your electrical inspection passes, we submit the signed agreement and inspection card.
Permission to Operate
Meter exchange is scheduled, PTO is issued, and you legally switch the system on.
Flat rate
$495
Covers your full interconnection and net metering process from application through Permission to Operate.Book a Consultation
Application prepared and filed for you
Net metering tariff guidance
Utility correspondence handled
PTO follow-through, not just filing
NABCEP-certified · No high-pressure sales · You stay in control of your project