What's included
Everything your jurisdiction typically asks for, assembled into one submittal set.
Site plan and roof plan with array layout and setbacks
NEC 2023 code compliance documentation
Equipment spec sheets and listing documents
Jurisdiction-specific forms filled out for you
Single-line and three-line electrical diagrams
Structural attachment details and load summary
Placard and labeling schedule per NEC 690/705
One round of plan-review corrections included
How it works
Three steps, no sales calls in between.
Submit project details
Send photos, your address, panel/roof info, and your main service panel details through a short intake form.
We prepare permit docs
A NABCEP-certified designer drafts your plan set and code documents, usually within 5–7 business days.
You file with confidence
Submit to your local jurisdiction with our guidance — and we handle any correction comments that come back.
Flat rate
$895
Flat rate for a typical single-family residential rooftop system. Battery or ground-mount add-ons quoted up front.
Complete permit-ready plan set (PDF)
One correction round included
Engineering stamp coordination where required
Direct access to your designer
NABCEP-certified · No high-pressure sales · You stay in control of your project
